Project Overview

JAX DBF Project consists of:

Demolition works:

  • Removing the kitchen ceiling, tiles, MEP services, asphalt, & guard room.

Earthworks:

  • Preparing the ground level including excavation, backfilling, compaction, testing, & applying anti-termite.

Concrete skeleton works:

  • Includes steel works, shuttering, concrete casting, & concrete pouring and curing.

Steel Structure works:

  • Design and build of steel structure works include anchor bolts fixing in concrete foundation, steel fabrication, installation, support fixing, protection, & sandwich panel installation.

Finishing works:

  • Starting from the block works, plastering, gypsum board partitions & ceiling, ceramic tiles, handrails,  painting, and epoxy flooring.

Landscape works:

  • Landscape works include a bienalli terrace, epoxy flooring, handrails, interlock, pergola, awnings, and main gate.
  • Asphalt works


Client: MAC

Consultant: Saud Consult

Project Owner: Diriyah Biennale Foundation - Ministry of Culture